Factory parts data · Europe

Toyota Lexus LC500/500H

2023-05 → present · chassis GWZ100,URZ100 · catalogue 433220 · Europe

Supported model Data version 2023-05
Exploded illustration 84Q853B 82600D — INSTRUMENT PANEL FUSE (12 parts) 82210N — INSTRUMENT PANEL FUSIBLE LINK (2 parts) 84345 — ADJUSTER, STOP LAMP SWITCH MOUNTING (2 parts) 84340 — SWITCH ASSY, STOP LAMP (2 parts) 82673B — BRACKET, JUNCTION BLOCK, NO.2 (4 parts) 82673A — BRACKET, JUNCTION BLOCK, NO.1 (4 parts) 89111 — COMPUTER, NETWORK GATEWAY (4 parts) 894C1 — COMPUTER, SHIFT CONTROL (4 parts) 894C7 — BRACKET, SHIFT CONTROL COMPUTER, NO.1 (4 parts) 89227 — COMPUTER, MULTIPLEX TILT & TELESCOPIC (2 parts) 89980 — COMPUTER ASSY, HYBRID VEHICLE CONTROL (12 parts) 89120A — SENSOR, AUTOMATIC LIGHT CONTROL (2 parts) 69065A — CYLINDER SUB-ASSY, AIRBAG CUT OFF SWITCH (1 parts) 8271550M20 — not listed in this catalogue 9015350015 — not listed in this catalogue 9017906274 — not listed in this catalogue 9017906274 — not listed in this catalogue 9015960383 — not listed in this catalogue 9011906A11 — not listed in this catalogue 9167380620 — not listed in this catalogue 9167380620 — not listed in this catalogue 9018306032 — not listed in this catalogue 82644 — COMPUTER, SEMICONDUCTOR POWER INTEGRATION (12 parts) 9011906A11 — not listed in this catalogue 894C8 — BRACKET, SHIFT CONTROL COMPUTER, NO.2 (4 parts) 82672C — COVER, JUNCTION BLOCK (4 parts) 82600D — INSTRUMENT PANEL FUSE (12 parts) 82210N — INSTRUMENT PANEL FUSIBLE LINK (2 parts) 82730F — BLOCK ASSY, JUNCTION, LH (4 parts) 82673F — BRACKET, JUNCTION BLOCK (4 parts) 82673C — BRACKET, JUNCTION BLOCK (4 parts) 82730E — BLOCK ASSY, JUNCTION, RH (4 parts) 9017906274 — not listed in this catalogue 82600D — INSTRUMENT PANEL FUSE (12 parts) 82210N — INSTRUMENT PANEL FUSIBLE LINK (2 parts) 82672B — COVER, JUNCTION BLOCK (4 parts) 89221 — COMPUTER, MULTIPLEX NETWORK BODY (81 parts) 8271550M10 — not listed in this catalogue 9017906274 — not listed in this catalogue 85970A — RELAY ASSY, DOUBLE LOCK DOOR CONTROL (15 parts) 9017906274 — not listed in this catalogue 89181B — COMPUTER, STEERING CONTROL, FR (8 parts) 9017906274 — not listed in this catalogue 82644B — COMPUTER, SEMICONDUCTOR POWER INTEGRATION, NO.2 (4 parts) 9011906A11 — not listed in this catalogue
84Q853B · 29 callouts, 16 unlisted Full size ↗
Dashed callouts are standard fasteners the factory draws but does not list as separate parts — there is no part number behind them.
203 parts on this figure
Part number Description Fitment Price
69065A — Cylinder Sub-assy, Airbag Cut Off Switch
69065-12460 Cylinder Sub-assy, Airbag Cut Off Switch
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
82210N — Instrument Panel Fusible Link
90982-08306 note Instrument Panel Fusible Link
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
90982-08306 note Instrument Panel Fusible Link
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
82600D — Instrument Panel Fuse
90982-09019 note Instrument Panel Fuse
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
90982-09019 note Instrument Panel Fuse
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
90982-09020 note Instrument Panel Fuse
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
90982-09020 note Instrument Panel Fuse
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
90982-09021 note Instrument Panel Fuse
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
90982-09021 note Instrument Panel Fuse
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
90982-09022 note Instrument Panel Fuse
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
90982-09022 note Instrument Panel Fuse
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
90982-09024 note Instrument Panel Fuse
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
90982-09024 note Instrument Panel Fuse
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
90982-09025 note Instrument Panel Fuse
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
90982-09025 note Instrument Panel Fuse
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
82644 — Computer, Semiconductor Power Integration
82644-50040 Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 LHD EUR —
82644-50040 Computer, Semiconductor Power Integration
2023-05 → —
GWZ100 ARL,GCC,GEN —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50040 note Computer, Semiconductor Power Integration
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644B — Computer, Semiconductor Power Integration, NO.2
82644-50030 Computer, Semiconductor Power Integration, NO.2
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
82644-50030 Computer, Semiconductor Power Integration, NO.2
2023-05 → —
GWZ100 CHI —
82644-50030 note Computer, Semiconductor Power Integration, NO.2
2023-05 → 2024-03 ended
GWZ100 LHD EUR —
82644-50030 note Computer, Semiconductor Power Integration, NO.2
2023-05 → 2023-10 ended
GWZ100 RHD EUR —
82672B — Cover, Junction Block
82672-50360 Cover, Junction Block
2023-05 → —
GWZ100,URZ100 ARL —
82672-50360 Cover, Junction Block
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
82672-50370 Cover, Junction Block
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
82672-50370 Cover, Junction Block
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
82672C — Cover, Junction Block
82672-50350 Cover, Junction Block
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
82672-50350 Cover, Junction Block
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
82672-50380 Cover, Junction Block
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
82672-50380 Cover, Junction Block
2023-05 → —
GWZ100,URZ100 ARL —
82673A — Bracket, Junction Block, NO.1
82673-48130 Bracket, Junction Block, NO.1
2023-05 → —
GWZ100,URZ100 ARL —
82673-48130 Bracket, Junction Block, NO.1
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
82673-50040 Bracket, Junction Block, NO.1
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
82673-50040 Bracket, Junction Block, NO.1
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
82673B — Bracket, Junction Block, NO.2
82673-50050 Bracket, Junction Block, NO.2
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
82673-50050 Bracket, Junction Block, NO.2
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
82673-50060 Bracket, Junction Block, NO.2
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
82673-50060 Bracket, Junction Block, NO.2
2023-05 → —
GWZ100,URZ100 ARL —
82673C — Bracket, Junction Block
82673-48130 Bracket, Junction Block
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
82673-48130 Bracket, Junction Block
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
82673-50040 Bracket, Junction Block
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
82673-50040 Bracket, Junction Block
2023-05 → —
GWZ100,URZ100 ARL —
82673F — Bracket, Junction Block
82673-50050 Bracket, Junction Block
2023-05 → —
GWZ100,URZ100 ARL —
82673-50050 Bracket, Junction Block
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
82673-50060 Bracket, Junction Block
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
82673-50060 Bracket, Junction Block
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
82730E — Block Assy, Junction, RH
82730-5A581 Block Assy, Junction, RH
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
82730-5A581 Block Assy, Junction, RH
2023-05 → —
GWZ100,URZ100 ARL —
82730-5A591 Block Assy, Junction, RH
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
82730-5A591 Block Assy, Junction, RH
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
82730F — Block Assy, Junction, LH
82730-5A571 Block Assy, Junction, LH
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
82730-5A571 Block Assy, Junction, LH
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
82730-5A601 Block Assy, Junction, LH
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
82730-5A601 Block Assy, Junction, LH
2023-05 → —
GWZ100,URZ100 ARL —
84340 — Switch Assy, Stop Lamp
84340-19075 Switch Assy, Stop Lamp
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
84340-19075 Switch Assy, Stop Lamp
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
84345 — Adjuster, Stop Lamp Switch Mounting
84345-51010 Adjuster, Stop Lamp Switch Mounting
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
84345-51010 Adjuster, Stop Lamp Switch Mounting
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
85970A — Relay Assy, Double Lock Door Control
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → —
GWZ100 ARL —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → —
GWZ100 GEN;URZ100 CONV GEN —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → —
URZ100 GEN —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → —
URZ100 ARL —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → —
GWZ100,URZ100 ARL —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → —
GWZ100 ARL;URZ100 CONV ARL —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → —
URZ100 ARL —
85970-11030 Relay Assy, Double Lock Door Control
2023-05 → —
GWZ100,URZ100 ARL,GEN —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → 2024-10 ended
GWZ100,URZ100 GEN —
85970-11030 Relay Assy, Double Lock Door Control
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → 2023-11 ended
GWZ100 RHD EUR —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → 2023-11 ended
GWZ100,URZ100 GEN —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → 2023-11 ended
URZ100 CP GEN —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → 2023-11 ended
URZ100 CP ARL —
85970-11030 note Relay Assy, Double Lock Door Control
2023-05 → —
GWZ100 ARL —
89111 — Computer, Network Gateway
89111-50070 Computer, Network Gateway
2023-05 → 2024-03 ended
URZ100 EUR —
89111-50070 Computer, Network Gateway
2023-05 → —
URZ100 ARL,GCC,GEN —
89111-50080 Computer, Network Gateway
2023-05 → 2024-03 ended
GWZ100 EUR —
89111-50080 Computer, Network Gateway
2023-05 → —
GWZ100 ARL,CHI,GCC,GEN —
89120A — Sensor, Automatic Light Control
89121-30020 Sensor, Automatic Light Control
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
89121-30020 Sensor, Automatic Light Control
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
89181B — Computer, Steering Control, FR
89181-11130 note Computer, Steering Control, FR
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
89181-11130 note Computer, Steering Control, FR
2023-05 → —
GWZ100 ARL —
89181-11140 note Computer, Steering Control, FR
2023-05 → 2024-03 ended
GWZ100 LHD EUR —
89181-11140 note Computer, Steering Control, FR
2023-05 → —
GWZ100 CHI,GCC,GEN —
89181-11150 note Computer, Steering Control, FR
2023-05 → 2024-03 ended
URZ100 RHD CP EUR —
89181-11150 note Computer, Steering Control, FR
2023-05 → —
URZ100 CP ARL —
89181-11160 note Computer, Steering Control, FR
2023-05 → 2024-03 ended
URZ100 LHD CP EUR —
89181-11160 note Computer, Steering Control, FR
2023-05 → —
URZ100 CP (GCC,GEN) —
89221 — Computer, Multiplex Network Body
89220-11P40 Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11P50 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11P60 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11P70 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11P80 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11P90 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11Q00 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11Q10 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11Q20 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CP EUR —
89220-11Q30 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CP EUR —
89220-11Q40 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11Q50 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11Q60 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD CP EUR —
89220-11Q70 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CP EUR —
89220-11Q80 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CP EUR —
89220-11Q80 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CP EUR —
89220-11Q90 note Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP GCC —
89220-11R00 Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP GCC —
89220-11R10 note Computer, Multiplex Network Body
2023-05 → 2024-10 ended
GWZ100 GCC —
89220-11R10 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CP GCC —
89220-11R10 note Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP GCC —
89220-11R20 note Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP GCC —
89220-11R20 note Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP GCC —
89220-11R30 note Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP GCC —
89220-11R40 note Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP GCC —
89220-11R50 Computer, Multiplex Network Body
2023-05 → —
GWZ100 CHI —
89220-11R60 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CP GEN —
89220-11R70 note Computer, Multiplex Network Body
2023-05 → 2024-10 ended
GWZ100,URZ100 CP GEN —
89220-11R80 Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP GEN —
89220-11R90 note Computer, Multiplex Network Body
2023-05 → —
GWZ100 GEN —
89220-11S00 note Computer, Multiplex Network Body
2023-05 → 2025-08 ended
GWZ100,URZ100 CP GEN —
89220-11S10 note Computer, Multiplex Network Body
2023-05 → 2024-10 ended
URZ100 CP GEN —
89220-11S20 Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD CP EUR —
89220-11S30 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD CP EUR —
89220-11S40 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD CP EUR —
89220-11S50 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
89220-11S50 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100 RHD EUR —
89220-11S60 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD CP EUR —
89220-11S70 note Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP ARL —
89220-11S80 note Computer, Multiplex Network Body
2023-05 → —
GWZ100 ARL —
89220-11S90 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CP ARL —
89220-11T00 note Computer, Multiplex Network Body
2023-05 → 2024-10 ended
URZ100 CP ARL —
89220-11T00 note Computer, Multiplex Network Body
2024-10 → —
GWZ100 ARL —
89220-11T10 note Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP ARL —
89220-11T20 note Computer, Multiplex Network Body
2023-05 → —
GWZ100 ARL —
89220-11T30 Computer, Multiplex Network Body
2023-05 → —
GWZ100,URZ100 CP ARL —
89220-11T40 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CP ARL —
89220-11U20 Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11U30 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11U40 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11U50 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11U60 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11U70 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11U80 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11U90 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11V00 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11V10 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11V20 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 LHD CONV EUR —
89220-11V30 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GCC —
89220-11V40 Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GCC —
89220-11V50 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GCC —
89220-11V50 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GCC —
89220-11V60 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GCC —
89220-11V60 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GCC —
89220-11V70 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GCC —
89220-11V80 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GCC —
89220-11V90 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GEN —
89220-11W00 note Computer, Multiplex Network Body
2023-05 → 2024-10 ended
URZ100 CONV GEN —
89220-11W10 Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GEN —
89220-11W20 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV GEN —
89220-11W30 note Computer, Multiplex Network Body
2023-05 → 2025-08 ended
URZ100 CONV GEN —
89220-11W40 Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 RHD CONV EUR —
89220-11W50 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 RHD CONV EUR —
89220-11W60 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 RHD CONV EUR —
89220-11W70 note Computer, Multiplex Network Body
2023-05 → 2024-03 ended
URZ100 RHD CONV EUR —
89220-11W80 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV ARL —
89220-11W90 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV ARL —
89220-11X00 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV ARL —
89220-11X10 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV ARL —
89220-11X20 Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV ARL —
89220-11X30 note Computer, Multiplex Network Body
2023-05 → —
URZ100 CONV ARL —
89227 — Computer, Multiplex Tilt & Telescopic
89227-48070 Computer, Multiplex Tilt & Telescopic
2023-05 → 2024-03 ended
GWZ100,URZ100 EUR —
89227-48070 Computer, Multiplex Tilt & Telescopic
2023-05 → —
GWZ100,URZ100 ARL,CHI,GCC,GEN —
894C1 — Computer, Shift Control
894C1-11070 Computer, Shift Control
2023-05 → 2024-03 ended
GWZ100 EUR —
894C1-11070 Computer, Shift Control
2023-05 → —
GWZ100 ARL,CHI,GCC,GEN —
894C1-11080 Computer, Shift Control
2023-05 → 2024-03 ended
URZ100 EUR —
894C1-11080 Computer, Shift Control
2023-05 → —
URZ100 ARL,GCC,GEN —
894C7 — Bracket, Shift Control Computer, NO.1
894C7-11010 Bracket, Shift Control Computer, NO.1
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
894C7-11010 Bracket, Shift Control Computer, NO.1
2023-05 → —
GWZ100,URZ100 ARL —
894C7-11020 Bracket, Shift Control Computer, NO.1
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
894C7-11020 Bracket, Shift Control Computer, NO.1
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
894C8 — Bracket, Shift Control Computer, NO.2
894C8-11010 Bracket, Shift Control Computer, NO.2
2023-05 → 2024-03 ended
GWZ100,URZ100 RHD EUR —
894C8-11010 Bracket, Shift Control Computer, NO.2
2023-05 → —
GWZ100,URZ100 ARL —
894C8-11020 Bracket, Shift Control Computer, NO.2
2023-05 → 2024-03 ended
GWZ100,URZ100 LHD EUR —
894C8-11020 Bracket, Shift Control Computer, NO.2
2023-05 → —
GWZ100,URZ100 CHI,GCC,GEN —
89980 — Computer Assy, Hybrid Vehicle Control
89980-11340 Computer Assy, Hybrid Vehicle Control
2023-05 → 2024-03 ended
GWZ100 EUR —
89980-11340 Computer Assy, Hybrid Vehicle Control
2023-05 → —
GWZ100 GEN —
89980-11360 note Computer Assy, Hybrid Vehicle Control
2024-10 → —
GWZ100 ARL —
89980-11360 Computer Assy, Hybrid Vehicle Control
2023-05 → —
GWZ100 GCC —
89980-11360 note Computer Assy, Hybrid Vehicle Control
2023-05 → 2025-08 ended
GWZ100 GEN —
89980-11360 note Computer Assy, Hybrid Vehicle Control
2023-05 → 2024-10 ended
GWZ100 GEN —
89980-11360 note Computer Assy, Hybrid Vehicle Control
2023-05 → 2024-03 ended
GWZ100 LHD EUR —
89980-11360 note Computer Assy, Hybrid Vehicle Control
2023-05 → 2024-03 ended
GWZ100 LHD EUR —
89980-11370 Computer Assy, Hybrid Vehicle Control
2023-05 → —
GWZ100 CHI —
89980-11380 note Computer Assy, Hybrid Vehicle Control
2023-05 → 2024-03 ended
GWZ100 LHD EUR —
89980-11380 Computer Assy, Hybrid Vehicle Control
2023-05 → —
GWZ100 ARL —
89980-11380 note Computer Assy, Hybrid Vehicle Control
2023-05 → —
GWZ100 GEN —
No quantity column: the factory catalogue records which parts a vehicle takes, never how many.